We use cookies to improve your experience, some are essential for the operation of this site.
About the cookies we use
Accept
Log in
ImportActions
Selections
0
Settings
View items
Field search
Subject search
Location search
Recent searches
Documentation
Quick start guide
Subject matches "Launch and Recovery activity" or its children
1
2
3
4
5
6
7
8
9
10
14
Page 2 of 14
Search within
By field
By subject
By location
By folder / collection
By recent searches
Export data
Select all
Toggle selected
Clear selected
20
50
100
Thumb
Detail
Best match
iBase ID
Date of item (Most recent first)
Date of item (Most recent last)
Date of upload (Most recent first)
Date of upload (Most recent last)
Title (A - Z)
Title (Z - A)
Average rating
Your rating
Stern of Chain with Thermistor winch in use during thermistor deployment.
Clamping wire in preparation to retrieve wire
Retrieving wire over the side
Working to remove pinger from 1/2 inch wire
View of knot in the 1/2 inch wire
Raising core to Chain deck
John Whetten preparing equipment for lowering
LCD indicating movement to winch operator
Probe back on deck
Working aboard Chain, heat probe measurements
Unidentified man working on deck of R/V Chain.
Watching an instrument, stern of Chain
Group working with instrument lowering
Group getting instrument ready to deploy
Retrieving instrument from over the side of Chain
Retrieving surface buoy
Buoy going over the side of Chain
Single channel seismic array in water from deck of Chain
F. Beecher Wooding on deck of Chain with corer
Warren Witzell on deck with instrument over side of Chain
1
2
3
4
5
6
7
8
9
10
14
Page 2 of 14
Selections
0
Open full page
Clear all
Search within
By field
By subject
By location
By folder / collection
By recent searches
Print
Export data
Collection
Edit
Lock
Workflow