We use cookies to improve your experience, some are essential for the operation of this site.

Long core rope storage drum being loaded onto R/V Knorr.

Long core rope storage drum being loaded onto R/V Knorr.
Long core rope storage drum being loaded onto R/V Knorr.
Long core rope storage drum being loaded onto R/V Knorr.
Long core rope storage drum being loaded onto R/V Knorr.
Comments (0)
66437
Kleindinst, Thomas N.
Long core rope storage drum being loaded onto R/V Knorr.
Still Image
04/12/2007
graphics/Long_Core_System_on_Knorr/_DSC0727.jpg
Image of The Day caption:
Dock workers use a crane to lift the 48,500-pound rope storage winch onto the deck of the research vessel Knorr. The winch will hold a fiber rope that was custon built for the new long-coring device that will be deployed for the first time in the fall of 2007.
Photo by Tom Kleindinst
© Woods Hole Oceanographic Institution
Labels
This item includes these files
Collections